Footing and Pier Inspections
Why Inspection Fails
There is mud and/or water in the footing or pier excavation.
The steel reinforcement is not the grade, type or size specified in the approved plans.
The steel reinforcement is not properly placed, tied or supported per the approved plans.
Unsuitable soil conditions are observed and a soil engineer has not been involved to document any deficiencies and make written recommendations.
Fill has been placed or compacted in the excavation without the supervision of a soil engineer.
Cold weather concreting protective measures have not been taken.
Ceiling Cover Inspections
Drywall Inspections
Final Inspections
Footing and Pier Inspections
Foundation Inspections
Framing Inspections
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow